This link navigates to the Savvy Task Board Board Configurations table that shows the configuration records of each Savvy Task Board enabled board. You need to initially setup an active Savvy Task Board Configuration record to enable Savvy Task Board for a new board. Savvy Task Boards have to be data driven boards based on “task” table with no vertical lane field selected to be ready as a Savvy Task Board. It is also possible to add and use horizontal swim lanes later. Additional filter (e.g. assignment group) makes the board specific for the support teams that use the board. It is recommended to also add an active=true filter condition.